„Düsseldorf on the Rhine – Setting out for new Shores“ – this was the slogan under which the concept for the rerouting of traffic ( 45 000 vehicles / day ) from the Rhine embankment into a road tunnel of length 1 930m was developed. Entirely new qualities were brought to the „old“ town and to many areas beyond.

Fields of activity:

  • Framework concept in a multidisciplinary planning team
  • Tunnel concept based on the idea of a two-tier tunnel
  • Traffic engineering preliminary design
  • Cost estimate
  • Full connection of the “Oberkasseler” Bridge
  • Full connection of the „Rheinkniebrücke”
  • Full connection of junction “Landtag / Bilk”
  • Road crossing “Siemens / RWI”
  • Subway Gladbach Steet
  • Half connection „Bilk Süd“